Tenneco is one of the world’s leading designer and manufacturer of automotive products for original equipment and aftermarket customers, with approximately 66,000 team members working at more than 200 sites worldwide .What has been saved and where? Tenneco’s Manufacturing site of over 145,000 sq ft in size is based in Merthyr Tydfil, South Wales. Tenneco approached Zeron through our partner Cromwell Tools to evaluate the possible savings on electricity consumption available to the site.
Tenneco’s infrastructure contains many specialised machines & equipment unique to their manufacturing process and any proposed solution needed to be compatible with them. With an estimated electricity cost of £1.4M+ at the site an OPTISAVE ULTRA 2900 Voltage optimiser was added to the existing switch room. With instant effect the OPTISAVE ULTRA continues to save Tenneco money and CO2 emissions 24/7. Another Zeron success story as experienced by thousands of businesses across the UK.
ENERGY SAVINGS
MONEY SAVED
MONTHS PAYBACK
CARBON FOOTPRINT REDUCTION
KWHRS SAVED
PER ANNUM