Case study

BUPA

context AND Requirements

Bupa, was understandably cautious about implementing site-wide voltage optimisation. The potential impact on sensitive medical equipment was a major concern, and the anticipated energy savings seemed uncertain given the prevalence of electronics-based equipment. Zeron, however, didn’t shy away from the challenge. After a meticulous survey of two Bupa sites, they confirmed the validity of Bupa’s concerns.

The solution? A targeted, localised approach to voltage optimisation, focusing solely on the admin/building services block where significant energy savings were possible. This approach eliminated any operational risks and reduced project costs, all while delivering impressive energy savings comparable to a full-site installation. It was a testament to Zeron’s commitment to understanding their clients’ unique needs and tailoring solutions that deliver both peace of mind and tangible results. Bupa’s success story highlights Zeron’s ability to navigate complex challenges and provide innovative solutions that empower businesses to embrace sustainability without compromise. Zeron: more power to your business and more power to the planet.

ENERGY SAVINGS

£17,344

MONEY SAVED

9

MONTHS PAYBACK

21 TONNES

CARBON FOOTPRINT REDUCTION

38,543

KWHRS SAVED
PER ANNUM

WHAT THE CLIENT HAD TO SAY